Erection Procedures
Wichita Central Corridor
: 22
: Wichita_Central_Corridor
More Projects
Transport on site
Transport on site
Start of installation
Start of installation
Lift unit from truck
Lift unit from truck 752 Kb
Lower unit for installation
Lower unit for installation 2.4 Mb
Turn unit for installation
Turn unit for installation
Install first unit in 3 to 5 minutes
Install first unit in 3 to 5 minutes 2.9 Mb
Install second unit
Install second unit
Second unit installed
Second unit installed 0.9 Mb
Install units side by side
Install units side by side
Lower back unit into position
Lower back unit into position
Slide back unit down along back of front unit
Slide back unit down along back of front unit
Final position OK
Final position OK
Easy filling with big shovel
Easy filling with big shovel
Final filling with bobcat
Final filling with bobcat
Compact fill:  NO shifting of units
Compact fill: NO shifting of units 415 Kb
Install second row on top
Install second row on top
Install back units
Install back units
Evergreen MAXI  Unit
Evergreen MAXI Unit 58 Kb
Front units and back units
Front units and back units 82 Kb
High and low board units
High and low board units 66 Kb
Evergreen Parapet - With legs to connect temporarily
Evergreen Parapet - With legs to connect temporarily 46 Kb
Evergreen units cover more face area
Evergreen units cover more face area